Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 10: | Line 10: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[ | | bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[Acute and chronic abdominal pain|'''No''']] | ||
|} | |} | ||
* A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. | * A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. |
Revision as of 19:40, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Definition
- Abdominal pain is considered acute if the duration is less than six months and chronic when it has been occurring over at least six months, either constantly or intermittently.[1]
- Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity.[2] It is less than 24 hours in duration and may require surgical evaluation and intervention.
Approach
Hemodynamic instability? | Yes | No |
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.
- ↑ "ICD-10 Version:2010".