Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 5: | Line 5: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[ | | bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[Types of abdominal pain smart algorithm|'''No''']] | ||
|} | |} | ||
Revision as of 20:04, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Hemodynamic instability? | Yes | No |
Definition
- Abdominal pain is pain that you feel anywhere between your chest and groin. This is often referred to as the stomach region or belly.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.