Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 9: | Line 9: | ||
==Definition== | ==Definition== | ||
* Abdominal pain is pain that you feel anywhere between your chest and groin | * Abdominal pain is pain that you feel anywhere between your chest and groin. | ||
* A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. | * A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. | ||
Revision as of 21:56, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Hemodynamically stable? | Yes | No |
Definition
- Abdominal pain is pain that you feel anywhere between your chest and groin.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.