Tachycardia critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]
Critical Pathways
Tachycardia Critical Pathways |
Wide QRS-Complex | Yes | No |
Definitions
- Tachycardia is defined as a heart rate of greater than 100 beats/min.
- Wide QRS if 3 or more QRS>0,12 s
Action Items
- Maintain patent airway
- Maintain i.v. access
- Assist breathing as needed
- Administer oxygen if hypoxemic
- Monitor blood pressure, oximetry and attach ECG monitor/defibrillator