Tachycardia critical pathways

Revision as of 15:28, 27 February 2015 by Steven Bellm (talk | contribs)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]

Critical Pathways

Tachycardia Critical Pathways
Wide QRS-Complex Yes No

Definitions

  • Tachycardia is defined as a heart rate of greater than 100 beats/min.
  • Wide QRS if 3 or more QRS>0,12 s

Action Items

  • Maintain patent airway
  • Maintain i.v. access
  • Assist breathing as needed
  • Administer oxygen if hypoxemic
  • Monitor blood pressure, oximetry and attach ECG monitor/defibrillator

References