Tachycardia with pulse critical pathways

Revision as of 00:23, 30 July 2020 by WikiBot (talk | contribs) (Bot: Removing from Primary care)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]

Critical Pathways

Tachycardia Critical Pathways
Presence of pulse? Yes No
Hemodynamically stable? Yes No

Definitions

  • Hemodynamic instability is defined as:
  • SBP <90 mm Hg or
  • MAP ↓ >30 mm Hg below baseline

Action Items

  • Maintain patent airway; assist breathing as needed.
  • Maintain IV/IO access.
  • Administer oxygen if hypoxemic.
  • Monitor blood pressure, oximetry and attach ECG monitor/defibrillator.

References